|
|
INDUSTRIAL PRETREATMENT
Objectives of the Pretreatment Program
- To prevent the introduction of pollutants into the sewarage
system which will interfere with the operation of the wastewater treatment plant.
- Protect the collection systems and treatment facilities.
- To prevent the introduction of pollutants into sewerage system which will pass
through the treatment works into receiving waters.
- To protect the health and safety of the sanitary sewer workers and the general public.
- To improve opportunities to recycle and reclaim municipal and industrial wastewaters
and sludges.
Industries:
Currently there are 65 permitted industrial users. Eight are regulated as Federal categorical
industries, 26 are significant non-categorical and 31 insignificant non-catergorical. Permits
are issued for a three year period. Sanitary Sewers conducts compliance monitoring on all its
industrial users at least once yearly and most are monitored monthly. Categorical and significant
industrial users have self-monitoring requirements to sample and report twice per year and once
per year respectively. Inspections are performed by pretreatment staff on each industrial user
once per year.
Wastewater Permit Application Form (Word .DOC)
Self-Monitoring
Reporting Form (Word .DOC)
Local Limits:
The Lexington-Fayette County area is served by two wastewater treatment plants resulting in
two sets of local limits. The Town Branch WWTP services the northern and western areas and
downtown. The West Hickman WWTP services most of southern and eastern Fayette County.
Local Limits
Map of Treatment Plant Service Boundaries
Specific Discharge Limitations
Resource Links
Kentucky Division of Water
EPA Office of Wastewater Management
Water Environment Federation
Code of Federal Regulations
Kentucky Pollution Prevention Center
|
|